| Client | : | | | Challenge | : | Bajaj E&P BU – Special projects team has consolidated its strong position in the field of Sports Lighting by successfully completing the prestigious project for Flood lighting of Sawai Man Singh Cricket stadium at Jaipur. | | Solution | : | Highlights
- The project was completed in a record time span of 2 months from the date of order.
- Out of the total 21 matches played in the ICC Champions Trophy, six, including one semi-final were held at Jaipur Stadium under Bajaj flood lighting. All the matches were telecast live and the quality of lighting was appreciated by all the concerned.
- Order Value: Rs. 5.70 Crores.
- Scope of work: 4 nos. 50m high mast towers, 360 nos. 2kW metal halide flood lights, associated control and mimic panels, Power supply system including 11kV Breakers, 11kV/0.433kV Transformer, Main LT Power Panel, APFC / PFC Panels and Power & control cabling.
- The order was bagged against stiff competition from Philips and Dev Musco. The 50m High Masts with fixed head frame were successfully manufactured at Bajaj Ranjangaon Manufacturing Unit within the very tight time schedule available.
| |
|  | 